Authority’s Engineer for implementation of JJM projects in Odisha
Client: Rural Water Supply & Sanitation Department, Odisha
Area: Bhubaneshwar and Balasore circle
Status: Ongoing
Scope of Work:
- Review of the Drawings and Documents
- Review, inspection and monitoring of Construction Works
- Conducting Tests on completion of construction and issuing Completion/ Provisional Certificate
- Determining the costs of any works or services and/or their reasonableness
- Determining the period or any extension thereof, for performing any duty or obligation
- Assisting the Parties in resolution of disputes
- 6 blocks in Bhubaneshwar circle and 7 blocks in Balasore circle to cover more than 500 villages
AMRUT 2.0 in 20 ULBs of Madhya Pradesh
Client: Urban Administration & Development, Directorate (UADD), M.P.
Status: Ongoing
Scope of Work:
- Existing situation analysis of water supply, sewerage & sanitation systems
- Preparation of City Water Balance Plan (CWBP) & City Action plan (CAP)
- DPRs include conditional assessment of existing infrastructure, survey & investigation, engineering & designing, drawing, and estimates
- Implementation plans
- Development of green spaces / urban forestry in municipal area
- Rejuvenation & development of water bodies in urban areas
- Bid documents
- ULBs include Municipal Corporation of Ujjain; Municipal Councils of Narsinghgarh, Sarangpur, Biaora, Chanderi, and Ashoknagar; and Nagar Parishads of Isagarh, Rajgarh, Chhapiheda, Machalpur, Boda, Talen, Suthaliya, Khujner, Kurawar, Khilchipur, Jirapur, Pachore, Shadora, and Mungaoli.
DPR for Water Supply Schemes, Katwa Sub-Division
Client: Burdwan PHE Directorate, West Bengal
Area: Katwa Sub-Division, West Bengal
Status: Ongoing
Scope of Work:
- Preparation of piped water network system & design
- Route survey by DGPS (Differential Global Positioning System)
- Layout Plan
- Water distribution and transmission network
- DPR includes designs of physical features such as OHR, Pump House, etc, and cost estimates
- DPR for 27 schemes to cover approx. 98 villages
TPI & QM for JJM Projects, Jammu Province
Client: Jal Sakti (PHE) Dept., Jammu
Area: 10 Districts
Status: Ongoing
Scope of Work:
- Carry out inspection of all engineering works relating to civil, mechanical and electrical components executed under in-village infrastructure
- Quantity and quality of works executed
- Quality Control
- Safety measures during contraction
- Recommendations on the payment
- Functioning of the in-village infrastructure during trial run
- Districts are Jammu, Samba, Kathua, Udhampur, Reasi, Ramban, Doda, Kishtwar, Rajouri and Poonch.
DPR for Water Supply Schemes, Jalpaiguri
Client: PHE Directorate, Jalpaiguri Division, West Bengal
Area: Mal Block, Jalpaiguri District
Status: Ongoing
Scope of Work:
- Preparation of piped water network system & design
- Route survey by DGPS (Differential Global Positioning System)
- Layout Plan
- Water distribution and transmission network
- DPR includes designs of physical features such as OHR, Pump House, etc, and cost estimates
- 21 DPRs to cover approx. 72 villages
DPR for Water Supply Schemes, Chhattisgarh
Client: Public Health Engineering Dept., Chhattisgarh
Area: Korba, Bastar, Kondagaon and Mungeli Districts
Status: Ongoing
Scope of Work:
- Population Forecasting
- Topographical Survey
- Process and Hydraulic designs of all components
- Preparation of drawings such as Index plan, key plan, flow diagram, plotting, OHT’s, Pump houses etc
- DPR preparation for Single village and Multi-village schemes in 4 districts to cover 350+ villages
- Preparation of detailed quantity and abstract estimates
- Preparing the BOQ document
- Project Cost & Financial Viability
- Implementation Plan
Water Supply Scheme for Nazira Division
Client: PHE Department, Nazira, Assam
Status: Ongoing
Scope of Work:
- Topographic Survey
- Pre-feasibility assessments for new schemes
- Prepare distribution network
- Detailed project report for 109 rural water supply schemes with cost estimates including O&M cost.
Water Supply Scheme for Jorhat Division
Client: PHE Department, Jorhat, Assam
Status: Ongoing
Scope of Work:
- Topographic Survey
- Pre-feasibility assessments for new schemes
- Prepare distribution network
- Detailed project report for 68 rural water supply schemes with cost estimates including O&M cost.
Madikheda Multi Village Scheme
Client: Madhya Pradesh Jal Nigam Maryadit
Status: Ongoing
Scope of Work:
- Supervision and Quality Control Consultant for Multi Village water supply scheme
- Water supply from Madikheda Dam to 842 villages
- Supervise overall activity for efficient execution
- Verifying provisions at site
- Assisting PMC in project monitoring
- Quality Assurance of work and material
- Coordinate between stakeholders
- Maintain records
- Assisting in providing the functional household tap connections under Jal Jeevan Mission
Madia Multi Village Scheme
Client: Madhya Pradesh Jal Nigam Maryadit
Status: Ongoing
Scope of Work:
- Supervision and Quality Control Consultant for Multi Village water supply scheme
- Water supply from Madia Dam to 276 villages
- Supervise overall activity for efficient execution
- Verifying provisions at site
- Assisting PMC in project monitoring
- Quality Assurance of work and material
- Coordinate between stakeholders
- Maintain records
- Assisting in providing the functional household tap connections under Jal Jeevan Mission
Bina Khurai & Malthone Multi Village Scheme, MP
Client: Madhya Pradesh Jal Nigam Maryadit
Area: Sagar & Vidisha District
Status: Ongoing
Scope of Work:
- Supervise the overall activities for an efficient execution of multi village water supply scheme
- Assist PMC in overall Project Management of schemes
- Verifying the provisions at site with respect to bid documents
- Supervision and Quality control of works being executed by the EPC Contractor
- Quality Assurance of different material procured by the contractor
- Project Level Quality monitoring
- Assist PMC in Approval of Quality Plan, Safety Plan, Project Plan, Quality Assurance Plans for different materials procured by contractor
- Act as a coordinator in between EPC Contractor, VWSCs of different villages, other related institutions & PIU (Project Implementation Unit) in Execution matters
- Provide assistance in getting house service connections
- Measurement Books (MBs) & to produce bills as per norms during bills
Storm Water Drainage & Rain Water Harvesting System in Modipuram, Meerut, U.P.
Client: Continental India Pvt Ltd
Factory Area: 2,39,253 sq. mtr
Status: Ongoing
Scope of Work:
- Planning and designing rain water harvesting and conservation measures / structures in factory area.
- Planning & Designing of the Roof-top rainwater harvesting system
- Artificial Recharge: Planning within the campus(a) Design of drainage in the area(b) Study of drainage pattern and planning for artificial recharge(c) Design for artificial recharge structures(d) Integration of drainage with recharge structures
- Storm water Drain System.
Water Supply Scheme in Bundelkhand region, Uttar Pradesh
Client: State Water and Sanitation Mission under the Department of Rural Development, Government of Uttar Pradesh
Area: Hamirpur, Banda and Chitrakoot Districts
Scope of Work:
- The larger scheme of the project will focus on addressing the acute problem of drinking water supply in Bundelkhand region, and at a later stage Arsenic/ Fluoride and AES/JE affected areas in Uttar Pradesh, including the Bundelkhand and Vindhya regions.
- Engineering survey, planning, designing and preparation of DPR of clusters, project integration, reviewing and re-verifying integrated modules, carrying out necessary surveys, investigations, situational analysis, preliminary cost estimates and development of area wise spatial mapping on assets.
Interception & Diversion alongwith STP Scheme in 5 towns, Bihar (under National Mission of Clean Ganga)
Client: Bihar Urban Infrastructure Development Corporation Ltd. (BUIDCo)
Area: Khagariya, Maner, Dighwara, Manihari and Teghra Towns of Bihar State
Status: Ongoing
Scope of Work:
- Study, analyze, design and prepare DPR to provide effective drainage system for the areas.
- Undertaking a technical, financial, economic, environmental and social study, prioritized capital investment plan, detailed designs, drawings, cost estimates and bidding documents for planning and implementation.
- Stakeholders consultation.
Sewerage Management System for Sanchi & Maihar Town, Madhya Pradesh
Client: Madhya Pradesh Urban Development Company Limited
Area: Sanchi and Maihar Town, M.P.
Status: Ongoing
Scope of Work:
- Provision of treatment units
- Provision of Pumping units & rising main
- Provision of distribution network and House Service Connection
- Program of sewerage demand management
- Detailed design, drawings, cost estimates and work plan of implementation
- Bid Document preparation
- Operation and Maintenance Plan inclusive of manpower, material, energy requirement and cost.
Water Supply Scheme for 5 Towns of Uttarakhand
Client: Uttarakhand Jal Sansthan
Area: Jeevangarh, Nathanpur, Gumaniwala, Nathuwawala and Pratit Nagar
Scope of Work:
- Identification and development of source (ground water source)
- Provision of treatment units
- Provision of storage facility
- Provision of distribution network and House Service connections
- Program of water demand management
- Water metering
- Designing SCADA
- Detailed designs, drawings, cost estimates and work plan for implementation of works
- Operation and Maintenance plan inclusive of manpower, material, energy requirement and cost
Sewerage Scheme, Lucknow
Client: UP Jal Nigam
Area: 8,094 Hectares (approx.)
Status: Completed
- Project funded under the Central Government’s flagship programme, JnNURM
- Preparation of DPR of District 2 and District 4 in Lucknow city
- Designing of sewerage rising main STP, preparation of sewer profile, layout drawing, preparation of estimates/BOQ, etc.
Augmentation of Water Supply Scheme, Blantyre City, Malawi, Africa
Client: Lucky Export
Status: DPR Approved
- Augmentation of water supply to Blantyre city through Mount Mulanje (up to 12 million litres per day)
- Present water supply to be augmented by Likhubula River, originating from Mulanje Mountain (approx. 60 kms from the city)
River Pollution Abatement - Narmada
Client: UADD, M.P.
Area: Feasibility Report Approved
- City sanitation plan for four towns under NRCP (National River Conservation Plan)
- Hoshangabad, Dhamnod, Karieli & Saikheda of M.P.
- Consultancy Involved: Solid waste management, river front development, sewerage, drainage & water supply systems
Water Supply Scheme for Simdega Urban Area, Jharkhand
Client: Simdega Nagar Panchayat
Status: Final DPR Submitted
- Carried Topographical survey, Condition assessment of existing Water Supply System , House to House Population Survey, Survey of Alignment along Roads, Computer aided design of Water Supply networks
- Population projection and Water demand analysis
- Preparation of Detailed Project Report and Preparation of Estimates & BOQ
DPR for Water Supply system of Godda Nagar Panchayat - Jharkhand
Client: Godda Nagar Panchayat
Status: DPR Approved
- Carried Topographical Survey and Condition assessment Water Supply System , House to House Population Survey, Survey of Alignment along Roads, Computer aided design of Water Supply networks
- Population projection and demand analysis
- Preparation of Detailed Project Report and Preparation of Estimates & BOQ
Group Water Supply Scheme for various Villages & Towns of 7 Districts in M.P.
Client: M.P. Jal Nigam, Maryadit
Status: Completed
- Detailed Project Reports & BOQ Including Survey & Investigation, Designing, Drawing and Preparation of Estimates etc.
- Carried Topographical Survey and Condition assessment of existing Water Supply System, Water demand analysis and design of Intake well, Pumping Station, Treatment Plant House to House Population Survey, Survey of Alignment along Roads, Computer aided design of Water Supply networks
- Water Supply scheme were designed for Tejgarh, Badon Kalan, Baneta, Rajond, Semri Kalan, Pahargarh & Beohani districts of M.P
- Preparation of Detailed Project Report and Preparation of Estimates & BOQ
Sewerage Scheme- Bareilly (U.P)
Client: U.P. Jal Nigam
Status: Ongoing
- Preparation, Submission and Clearance of Feasibility Report (FR) and Detailed Project Report (DPR) from agencies such as MoEF (GOI), and other relevant agencies
- Topographical Survey work and Detailed design of Sewer network
- Preparation of Feasibility Report, Detailed Project Report, Bill of Quantity (B.O.Q) etc. for construction & improvement and augmentation of Sewerage System
Sewerage System in Anoopsahar, District Bulandshahr - Ghaziabad
Client: U.P. Jal Nigam
Status: Completed
- Preparation of Feasibility Report (FR) & Detail Project Report (DPR)
- Topographical Survey work and Detailed design of Sewer network
- Preparation of Feasibility Report, Detailed Project Report, Bill of Quantity (B.O.Q) etc. for construction & improvement and augmentation of Sewerage System
Sewerage System & Waste Water Management for Mandsaur City (M.P)
Client: Muncipal Council, Mandsaur (M.P)
Status: Final DPR Submitted for Approval
- Preparation of Feasibility Report (FR) & Detail Project Report (DPR)
- Topographical Survey work and Detailed design of Sewer network
- Preparation of Feasibility Report, Detailed Project Report, Bill of Quantity (B.O.Q) etc. for construction & improvement and augmentation of Sewerage System